by k&n » Sun Jun 13, 2010 1:58 pm
The pool was closed due to sub floor drains to be fitted and to do this required the pool area to be dug up to allow fitting. The water leaking was not coming from the pool but water that filters through the tiles and poolside drainage and collects on the sub floor and manages to leak through the joints in the concrete that forms the ceilling/floors.